I have a number of event-based schdules running on CRD on my PC, with the polling interval set to 300 seconds (5 minutes).
However, we have noticed that some reports are not being triggered for up to 20 or 30 minutes (based on when the schedule was triggered in the schedule history compared with a timestamp on the record in the database that would trigger the reprot.)
Has anyone else noticed delays with their event-based schedules?